Anggaran untuk Perakitan Cimahi

17 November 2008

Sesuai dengan email dari Pak Neven tanggal 17 November 2008, berikut adalah anggaran perakitan Cimahi,

Assembly Line (Brand New)

Dimension: 400Width*8000Length*750~1900Height

Torque: 1/4HP*220V*ψ3*4P*60HZ

Speed: 1~6M/MIN

Belt Material: PVC*2t*400W Anti Static Green Colored

Machine Frame: Aluminium 4060

Frame Material: Aluminium 4060

Accessories:

TL lamp tube 40W*220V*ψ1, on both side

Tools hanger on both side

SOP Frame:A3 size on both side

Working Station:300Width wood covered with anti static material on both side

Air:3/4ψ connectors every 1M

Power Station every 1M on both side

Budget:

-Assembly Line x1 Rp. 60,000,000,- Rp. 60,000,000,-

-Air Screw Drivers Set x10 Rp. 500,000,- Rp. 5,000,000,-

-Compressor Set x1 Rp. 500,000,- Rp. 500,000,-

-Air Conditioner 2PK x3 Rp. 2,500,000,- Rp. 7,500,000,-

-Racks for QC x5 Rp. 1,200,000,- Rp. 6,000,000,-

-Furnitures x1 Rp. 5,000,000,- Rp. 5,000,000,-

-Spare x1 Rp. 5,000,000,- Rp. 5,000,000,-

Total Rp. 89,000,000,-


Berikut adalah foto tempat perakitan:




Company data untuk Pak Mulyono

13 November 2008

Pak Mulyono membutuhkan file perkenalan Logicom dan Ikonus, file-file yang disertakan adalah:

- Company Profile Logicom
- Company Profile Ikonus
- i-Getz Price List
- Brosur

Semua file terdapat dalam email yang telah di CC ke email.

Denah perakitan SMK 1 Cimahi

07 November 2008

Setelah beberapa kali dikejar oleh Pak Adet mengenai perkembangan SMK 1 Cimahi, ternyata anggaran perakitan masih belum dapat didefinisikan karena denah tempat perakitan belum ada dan denah itu didapat dari Mas Eko. Berikut adalah denah ruang perakitan yang di email dari Mas Eko: